Net Zero Compare

Green Policies, Regulations & Standards

Policies tracked
1,137
Last updated
November 23, 2026

Filter (1000) Policies:


Portugal Urban Waste Water Treatment Framework (Law No. 152/97)

Portugal Urban Waste Water Treatment Framework (Law No. 152/97)

Portugal Urban Wastewater Law: Collection, Treatment Standards and Discharge Control
Portugal’s Decree-Law 152/97 regulates the collection, treatment, and discharge of urban wastewater, implementing EU Directive 91/271/EEC. It sets the legal basis for ensuring that wastewater is adequately collected and treated before discharge and that discharges do not compromise national water quality obligations. Compliance is continuous and primarily infrastructure and operator-driven, enforced through discharge licensing, performance controls, and corrective orders. Typical non-compliance involves insufficient treatment performance, non-compliant discharge conditions, or collection system failures leading to pollution events.
Portugal Industrial Emissions and Integrated Pollution Prevention and Control (Law No. 127/2013)

Portugal Industrial Emissions and Integrated Pollution Prevention and Control (Law No. 127/2013)

Portugal Industrial Emissions Regime: Integrated Permits and BAT-Based Controls
Portugal’s Industrial Emissions Regime under Decree-Law 127/2013 requires in-scope installations to operate under integrated environmental permits that control emissions to air, water, and soil and regulate waste generation. Operators must apply BAT where applicable, monitor and report emissions, and comply with permit limits and operating conditions. The framework is actively enforced through inspections, administrative fines, and corrective orders, with potential operational restrictions for serious breaches. Non-compliance typically involves exceedance of permit limits, failure to implement required upgrades, or weak monitoring and reporting controls.
Portugal National Electricity System and Renewables Market Rules (Law No. 15/2022)

Portugal National Electricity System and Renewables Market Rules (Law No. 15/2022)

Portugal Electricity System Law: Decree-Law 15/2022, Renewables and Self-Consumption Rules
Portugal’s Decree-Law 15/2022 is the core framework for the National Electricity System, governing market organisation, licensing, and grid-related rules while enabling renewable integration. It supports self-consumption, collective self-consumption, and energy communities through ERSE-approved codes covering commercial relationships, metering, and data handling. Compliance risk is driven by registration/licensing accuracy, grid connection conditions, and operational metering/data obligations, especially for collective schemes. Enforcement typically operates via regulatory orders, licence-based measures, and settlement impacts where system rules are breached.
Portugal Electric Mobility and Charging Infrastructure Market Rules (Law No. 93/2025)

Portugal Electric Mobility and Charging Infrastructure Market Rules (Law No. 93/2025)

Portugal Electric Mobility Law: New RJME and ERSE Rules for Charging Networks
Portugal’s electric mobility framework was overhauled by Decree-Law 93/2025, establishing a new Legal Framework for Electric Mobility that regulates market organisation, access, and charging activities and aligns national rules with the EU alternative fuels infrastructure context. ERSE implemented the operational layer through Code 3/2025 (22 December 2025), updating the Electric Mobility Regulation and repealing the prior regime. Compliance depends on actor role and includes operational, interoperability, and data-related duties, with transitional rules affecting implementation. Non-compliance risks include incorrect market status, breaches of ERSE operational rules, and failure to meet transparency and data obligations.
Portugal Natura 2000 and Protected Habitats and Species (Law No. 140/99)

Portugal Natura 2000 and Protected Habitats and Species (Law No. 140/99)

Portugal Natura 2000 Law: Appropriate Assessment and Strict Project Authorisation Conditions
Portugal’s Natura 2000 legal regime under Decree-Law 140/99 requires strict assessment and permitting controls for plans or projects that may significantly affect protected sites, habitats, or species. Where impacts are plausible, authorities must apply an appropriate assessment approach and only authorise projects under narrow legal conditions, with enforceable mitigation and monitoring requirements. Non-compliance is typically procedural and high impact: inadequate assessments, weak mitigation design, or insufficient justification can lead to permit annulment, project suspension, and enforcement escalation, including EU-level scrutiny where systemic implementation failures are alleged.
Poland Energy Policy (PL PEP2040 / EPP2040)

Poland Energy Policy (PL PEP2040 / EPP2040)

Poland PEP2040: National Energy Strategy Through 2040
PEP2040 is Poland’s central energy transition strategy adopted in 2021. It sets long-term direction for decarbonisation, energy security, power-sector transformation, RES scale-up, infrastructure modernisation, and nuclear development as a strategic pillar. While not a binding law on its own, it strongly shapes subsequent legislation, investment programmes, and permitting frameworks. The compliance relevance for businesses is indirect but significant: PEP2040 influences auctions, grid connection rules, industrial policy, and the trajectory of constraints and incentives across the energy system.
Portugal Public Procurement Sustainability Framework (Law No. 18/2008)

Portugal Public Procurement Sustainability Framework (Law No. 18/2008)

Portugal Public Procurement: Sustainability Criteria, Tender Challenges and Contract Enforcement
Portugal’s Public Contracts Code regulates public procurement and provides the legal basis to integrate sustainability into tenders through specifications, award criteria, and contract performance clauses, as long as transparency, equal treatment, and proportionality are respected. Compliance risk is high for both authorities and suppliers: poorly designed or opaque environmental criteria can lead to challenges, annulment, and re-tendering, while suppliers can be excluded for insufficient proof or face contract remedies if sustainability clauses are breached after award. For companies selling to the public sector, procurement rules often function as a practical sustainability compliance gateway.
Portugal controls wastewater discharges through Decree-Law 236/98, which sets aquatic protection objectives and discharge-related standards, and through the Water Resources Use Regime (Decree-Law 226-A/2007), which requires water use titles for discharges and imposes enforceable conditions. Operators must secure the relevant title before discharging and comply continuously with emission limits, monitoring, and reporting obligations defined in permits. Non-compliance usually involves unlicensed discharges, parameter exceedances, or weak monitoring evidence, and can lead to fines, corrective orders, suspension, and remediation. Particular risk exists for prohibited hazardous discharges to groundwater.
Portugal Ambient Air Quality Law (Law No. 102/2010)

Portugal Ambient Air Quality Law (Law No. 102/2010)

Portugal Air Quality Law: Monitoring Duties and Plans Triggered by Exceedances
Portugal’s air quality regime under Decree-Law 102/2010 requires continuous monitoring and management of ambient air pollution and compliance with EU-aligned pollutant limit values. Where exceedances occur, authorities must adopt or update Air Quality Plans and, for episodes, apply short-term measures and public warnings. The framework is binding and implemented through national and local actions affecting transport, heating, and other emission sources. Enforcement typically operates via administrative orders and fines tied to local restrictions, with growing litigation and policy scrutiny where air quality improvements are insufficient.
Portugal Nature Conservation and Biodiversity Regime (Law No. 142/2008)

Portugal Nature Conservation and Biodiversity Regime (Law No. 142/2008)

Portugal Biodiversity Law: Classified Areas, Authorisations and Project Constraints
Decree-Law 142/2008 is Portugal’s main nature conservation and biodiversity framework, structuring the regime for classified areas and the protection of natural values. It influences permitting by imposing compatible-use and authorisation controls where projects or activities may affect protected habitats, species and conservation objectives. The regime is binding for authorities and operators and typically operates through permit conditions, mitigation and monitoring requirements. Non-compliance most often involves unauthorised works in protected or classified areas or breaches of conservation conditions, creating exposure to administrative sanctions, restoration duties, and permitting annulment or project suspension.
Showing results 481 to 490 of 1000