Net Zero Compare

Green Policies, Regulations & Standards

Policies tracked
1,072
Last updated
September 18, 2026

Filter (1000) Policies:


Portugal Renewables Permitting Simplification (Law No. 116/2024)

Portugal Renewables Permitting Simplification (Law No. 116/2024)

Portugal Renewable Permitting Fast-Track: Exceptional Measures Extended to 2026
Portugal’s Decree-Law 30-A/2022 introduced exceptional measures to simplify and accelerate licensing for renewable generation, storage, and self-consumption projects. The regime provides administrative exemptions and streamlined procedures, but still requires compliance with remaining prerequisites such as grid-connection conditions and applicable environmental constraints. The special measures were extended and, according to legal alerts, are now maintained until 31 December 2026 via Decree-Law 116/2024. Non-compliance risk typically occurs when developers assume simplifications apply without meeting qualifying conditions, leading to loss of benefits, permit disputes, or enforcement under standard energy and environmental rules.
Portugal Public Water Domain and Coastal Public Land (Law No. 468/71)

Portugal Public Water Domain and Coastal Public Land (Law No. 468/71)

Portugal Public Water Domain Law: Coastal Margins, Authorisations and Enforcement
Portugal’s Decree-Law 468/71 defines and governs the public water domain, including the beds and margins of sea waters and inland waters. It is a key legal basis for controlling coastal and waterfront occupation and works, typically requiring project-specific public titles or authorisations and strict compliance with permit conditions. Non-compliance usually involves unauthorised occupation or works in coastal margins, leading to enforcement actions such as suspension, restoration, and administrative sanctions. For infrastructure, energy, tourism, and port developments, this regime is a core permitting constraint that must be addressed early.
Portugal Waste Transport and Traceability (PT e-GAR)

Portugal Waste Transport and Traceability (PT e-GAR)

Portugal e-GAR System: Mandatory Waste Transport Tracking and Traceability
Portugal’s waste transport framework requires most waste shipments to be accompanied by an electronic tracking guide (e-GAR), issued via the official platform, ensuring traceability from producer to carrier to receiving operator. The regime supports enforcement against illegal disposal, misclassification, and unlicensed movements. Compliance is operational and documentation-heavy, requiring accurate waste coding, quantities, origin/destination, and actor identification for each transport. Non-compliance commonly involves missing e-GAR, incorrect classification or inconsistent shipment records, triggering fines, stop orders, and heightened scrutiny during inspections.
Portugal Environmental Noise Law (Law No. 9/2007)

Portugal Environmental Noise Law (Law No. 9/2007)

Portugal Noise Law: Limits, Authorisations for Temporary Activities and Enforcement
Portugal’s General Noise Regulation (Decree-Law 9/2007) establishes binding rules to prevent and control environmental noise from permanent and temporary noisy activities. It sets noise limit values, requires assessment and mitigation where limits are exceeded, and commonly triggers licensing or authorisation requirements for temporary activities such as construction works and events. Enforcement is mainly municipal and inspection-driven, with administrative fines and corrective orders that may restrict operating hours, impose mitigation measures, or suspend activities in serious cases. Common non-compliance involves operating without authorisation, exceeding limits, or ignoring required mitigation.
Portugal Landfills and Disposal Controls (Annex II to Law No. 102-D/2020)

Portugal Landfills and Disposal Controls (Annex II to Law No. 102-D/2020)

Portugal Landfill Regime: Waste Acceptance Rules, Monitoring and Lifecycle Compliance
Portugal’s landfill legal regime, published as Annex II to Decree-Law 102-D/2020, regulates landfill operation through binding acceptance, permitting, monitoring, closure, and aftercare requirements. APA guidance reinforces the regime’s practical application and the compliance expectations for operators. The highest compliance exposure typically involves non-conforming waste acceptance, weaknesses in monitoring and control systems (leachate, gas, groundwater), and failures to follow permit conditions across the landfill lifecycle. Enforcement can include fines, corrective orders, operational restrictions, and in serious cases, suspension or closure.
Portugal Urban Waste Water Treatment Framework (Law No. 152/97)

Portugal Urban Waste Water Treatment Framework (Law No. 152/97)

Portugal Urban Wastewater Law: Collection, Treatment Standards and Discharge Control
Portugal’s Decree-Law 152/97 regulates the collection, treatment, and discharge of urban wastewater, implementing EU Directive 91/271/EEC. It sets the legal basis for ensuring that wastewater is adequately collected and treated before discharge and that discharges do not compromise national water quality obligations. Compliance is continuous and primarily infrastructure and operator-driven, enforced through discharge licensing, performance controls, and corrective orders. Typical non-compliance involves insufficient treatment performance, non-compliant discharge conditions, or collection system failures leading to pollution events.
Portugal Industrial Emissions and Integrated Pollution Prevention and Control (Law No. 127/2013)

Portugal Industrial Emissions and Integrated Pollution Prevention and Control (Law No. 127/2013)

Portugal Industrial Emissions Regime: Integrated Permits and BAT-Based Controls
Portugal’s Industrial Emissions Regime under Decree-Law 127/2013 requires in-scope installations to operate under integrated environmental permits that control emissions to air, water, and soil and regulate waste generation. Operators must apply BAT where applicable, monitor and report emissions, and comply with permit limits and operating conditions. The framework is actively enforced through inspections, administrative fines, and corrective orders, with potential operational restrictions for serious breaches. Non-compliance typically involves exceedance of permit limits, failure to implement required upgrades, or weak monitoring and reporting controls.
Portugal National Electricity System and Renewables Market Rules (Law No. 15/2022)

Portugal National Electricity System and Renewables Market Rules (Law No. 15/2022)

Portugal Electricity System Law: Decree-Law 15/2022, Renewables and Self-Consumption Rules
Portugal’s Decree-Law 15/2022 is the core framework for the National Electricity System, governing market organisation, licensing, and grid-related rules while enabling renewable integration. It supports self-consumption, collective self-consumption, and energy communities through ERSE-approved codes covering commercial relationships, metering, and data handling. Compliance risk is driven by registration/licensing accuracy, grid connection conditions, and operational metering/data obligations, especially for collective schemes. Enforcement typically operates via regulatory orders, licence-based measures, and settlement impacts where system rules are breached.
Portugal Electric Mobility and Charging Infrastructure Market Rules (Law No. 93/2025)

Portugal Electric Mobility and Charging Infrastructure Market Rules (Law No. 93/2025)

Portugal Electric Mobility Law: New RJME and ERSE Rules for Charging Networks
Portugal’s electric mobility framework was overhauled by Decree-Law 93/2025, establishing a new Legal Framework for Electric Mobility that regulates market organisation, access, and charging activities and aligns national rules with the EU alternative fuels infrastructure context. ERSE implemented the operational layer through Code 3/2025 (22 December 2025), updating the Electric Mobility Regulation and repealing the prior regime. Compliance depends on actor role and includes operational, interoperability, and data-related duties, with transitional rules affecting implementation. Non-compliance risks include incorrect market status, breaches of ERSE operational rules, and failure to meet transparency and data obligations.
Portugal Natura 2000 and Protected Habitats and Species (Law No. 140/99)

Portugal Natura 2000 and Protected Habitats and Species (Law No. 140/99)

Portugal Natura 2000 Law: Appropriate Assessment and Strict Project Authorisation Conditions
Portugal’s Natura 2000 legal regime under Decree-Law 140/99 requires strict assessment and permitting controls for plans or projects that may significantly affect protected sites, habitats, or species. Where impacts are plausible, authorities must apply an appropriate assessment approach and only authorise projects under narrow legal conditions, with enforceable mitigation and monitoring requirements. Non-compliance is typically procedural and high impact: inadequate assessments, weak mitigation design, or insufficient justification can lead to permit annulment, project suspension, and enforcement escalation, including EU-level scrutiny where systemic implementation failures are alleged.
Showing results 411 to 420 of 1000